MSAI Scotland · Dundee2026 / 2027 deployments

Sovereign GPU capacity,
available now.

10 MW of colocation available now in Scotland - plus confirmed GPU deployments: 2,048× NVIDIA H200 (Oct/Nov 2026) and 1,600× NVIDIA B300 (Oct 2026 – Feb 2027). Direct liquid cooling, island-mode gas-CHP power, 100% UK sovereign.

10 MW
Available now
2,048×
H200 · Oct 2026
1,600×
B300 · 2026–27
Dundee
Scotland, UK
GPU deployment roadmap

2026 / 2027 deployments.

Live capacity today, with new sovereign suites opening through 2027.

Available now

Colocation · 10 MW

10 MW of colocation available now - racks, cages and private suites in a live direct-liquid-cooled hall. Bring your own GPUs onto sovereign UK infrastructure today.

10 MW nowDLCRacks · cagesPrivate suites
Oct/Nov 2026 · confirmed

2,048× NVIDIA H200

A confirmed deployment of 2,048 NVIDIA H200 GPUs landing October/November 2026 - reservable now for training and inference on the sovereign estate.

2,048× H200Oct/Nov 2026ConfirmedReserve now
Oct 2026 – Feb 2027 · confirmed

1,600× NVIDIA B300

A confirmed 1,600× NVIDIA B300 (Blackwell Ultra) deployment phasing in from October 2026 to February 2027 - next-generation capacity for frontier workloads.

1,600× B300Oct 2026 – Feb 2027Blackwell UltraConfirmed
DC3 · digital twin
MOTHER Vision · live

Forward-looking: capacity, hardware and 2026 / 2027 deployment dates are indicative plans, not commitments, and may change. NVIDIA, HGX, Blackwell, GB10, AMD and Instinct are trademarks of their respective owners. See our Compliance & Transparency page.

Power & resilience

Island-mode gas-CHP (3+1 N+1) plus grid, with a 4 MWh BESS buffer. 10–15 MW available across the estate.

Cooling

Direct liquid cooling with well-water free cooling through a titanium WRAS Cat-5 PHE - PUE ~1.15, near-zero water waste.

Compute

NVIDIA HGX B300 and GB10 Blackwell, up to ~58 kW per rack. Bring your own hardware or take GPU-as-a-Service.

Network

Sovereign UK backbone with low-latency routes and dark-fibre options. Private interconnect to your estate.

Security & compliance

UK sovereign throughout - GDPR, EASR, on-prem / air-gap options and 24/7 MOTHER Vision monitoring.

Space & footprint

DC1-B ~463 m² DLC hall plus DC3 halls. Racks, cages, private suites and build-to-suit floor.

Quick overview
location
Dundee, Scotland (A85 / Riverside)
colocation
10 MW available now
H200
2,048× · Oct/Nov 2026
B300
1,600× · Oct 2026 – Feb 2027
estate
10–15 MW sovereign
cooling
DLC + well-water free cooling
rack density
up to 58 kW
PUE
~1.15
power
island gas-CHP (3+1 N+1) + grid
heat reuse
CHP → building HVAC (absorption)
compliance
UK sovereign · GDPR · EASR
Ways to deploy

However you need it.

Colocation

Racks and cages in a live DLC hall - you own the GPUs, we run the estate.

Private suite

A dedicated, secured suite sized to your deployment, with your own access control.

GPU-as-a-Service

Reserved HGX B300 / GB10 capacity billed by the hour or committed term - no capex.

Build-to-suit

We design and build to your spec on MSAI freehold - powered, cooled and operated by us.

MOTHER Compute

GPU-as-a-Service,
sovereign & affordable.

Don’t want to own hardware? Reserve NVIDIA B300 / H200 and AMD Instinct capacity on the MSAI estate - billed by the hour or committed term, on UK-sovereign, free-cooled infrastructure.

PUE ~1.15
Cooling
B300 · H200
NVIDIA
Instinct
AMD
Titanium
WRAS PHE
N+1
Resilient
Hourly
or committed
Client enquiry

Reserve your capacity.

Tell us your workload and target window. The MSAI Scotland team replies within one business day with available capacity, pricing and a site visit.

  • Island-mode gas-CHP power · N+1
  • HGX B300 / GB10 Blackwell · up to 58 kW/rack
  • CHP heat reuse · PUE ~1.15
  • UK sovereign · GDPR · air-gap options

We reply within one business day. Your details are handled under UK GDPR and never shared.