MSAI Scotland · DundeeGPU available from 28 Dec 2026

Sovereign GPU capacity,
available now.

A 38 MW sovereign site in Scotland scaling to 70 MW from 2027, with 25 MW of colocation available now. Confirmed GPU deployments - 2,048× NVIDIA H200, 1,600× NVIDIA B300 and 2,000× AMD Instinct MI355X - available from 28 December 2026. Direct liquid cooling, island-mode gas-CHP power, 100% UK sovereign.

38 MW
Site capacity
70 MW
From 2027
25 MW
Colo available now
28 Dec 2026
GPU available from
GPU deployment roadmap

Capacity & deployments.

25 MW live today, every GPU line available from 28 December 2026, and 70 MW of site capacity from 2027.

Available now

Colocation · 25 MW

25 MW of colocation available now - racks, cages and private suites in a live direct-liquid-cooled hall on a 38 MW site. Bring your own GPUs onto sovereign UK infrastructure today.

25 MW now38 MW siteDLCRacks · cages · suites
Available from 28 Dec 2026

2,048× NVIDIA H200

A confirmed deployment of 2,048 NVIDIA H200 GPUs, available from 28 December 2026 - reservable now for training and inference on the sovereign estate.

2,048× H200Available 28 Dec 2026ConfirmedReserve now
Available from 28 Dec 2026

1,600× NVIDIA B300

A confirmed 1,600× NVIDIA B300 (Blackwell Ultra) deployment, available from 28 December 2026 - next-generation capacity for frontier workloads.

1,600× B300Available 28 Dec 2026Blackwell UltraConfirmed
Available from 28 Dec 2026

2,000× AMD Instinct MI355X

A confirmed 2,000× AMD Instinct MI355X (CDNA 4) deployment, available from 28 December 2026 - an open alternative to CUDA on the same sovereign estate.

2,000× MI355XAvailable 28 Dec 2026CDNA 4ROCm
2027 · expansion

70 MW from 2027

Phase Two takes the site from 38 MW to 70 MW from 2027, with island-mode gas-CHP power scaling to 100 MWth and build-to-suit floor available on MSAI freehold.

70 MW from 2027Phase Two ✓100 MWthBuild-to-suit
DC3 protected power infrastructure, scope of supply: five 1200 kW UPS systems in N+1 parallel giving 6 MW installed, 35 lithium battery cabinets at five minutes autonomy, maintenance bypass system and client handoff panel
DC3 · protected power · 6 MW installed, N+1 parallel, 5 min autonomy

Forward-looking: capacity, hardware and 2026 / 2027 deployment dates - including 28 December 2026 GPU availability and the 70 MW 2027 expansion - are indicative plans, not commitments, and may change. NVIDIA, HGX, Blackwell, GB10, AMD and Instinct are trademarks of their respective owners. See our Compliance & Transparency page.

Power & resilience

Island-mode gas-CHP (3+1 N+1) plus grid, with a 4 MWh BESS buffer. A 38 MW site today, 70 MW from 2027.

Cooling

Direct liquid cooling with Horizon free cooling through a titanium WRAS Cat-5 plate heat exchanger - PUE ~1.10, near-zero water waste, chillers as trim only.

Compute

NVIDIA HGX B300, H200 and GB10 Blackwell plus AMD Instinct MI355X, up to ~58 kW per rack. Bring your own hardware or take GPU-as-a-Service.

Network

Sovereign UK backbone with low-latency routes and dark-fibre options. Private interconnect to your estate.

Security & compliance

UK sovereign throughout - GDPR, EASR, on-prem / air-gap options and 24/7 MOTHER Vision monitoring.

Space & footprint

DC1-B ~463 m² DLC hall plus DC3 halls. Racks, cages, private suites and build-to-suit floor.

Quick overview
location
Dundee, Scotland (A85 / Riverside)
site
38 MW · 70 MW from 2027
colocation
25 MW available now
GPU available
from 28 Dec 2026
H200
2,048×
B300
1,600×
MI355X
2,000× · CDNA 4
cooling
DLC + Horizon free cooling
rack density
up to 58 kW
PUE
~1.10
power
island gas-CHP (3+1 N+1) + grid
heat reuse
CHP → absorption → building HVAC
compliance
UK sovereign · GDPR · EASR
Ways to deploy

However you need it.

Colocation

25 MW available now: racks and cages in a live DLC hall - you own the GPUs, we run the estate.

Private suite

A dedicated, secured suite sized to your deployment, with your own access control.

GPU-as-a-Service

Reserved HGX B300 / H200 / MI355X capacity from 28 Dec 2026, billed hourly or on a committed term - no capex.

Build-to-suit

We design and build to your spec on MSAI freehold - powered, cooled and operated by us.

MOTHER Compute

GPU-as-a-Service,
sovereign & affordable.

Don’t want to own hardware? Reserve NVIDIA B300 / H200 and AMD Instinct capacity on the MSAI estate - billed by the hour or committed term, on UK-sovereign, free-cooled infrastructure.

PUE ~1.10
Cooling
B300 · H200
NVIDIA
MI355X
AMD Instinct
Titanium
WRAS PHE
N+1
Resilient
28 Dec 2026
Available from
Client enquiry

Reserve your capacity.

Tell us your workload and target window. The MSAI Scotland team replies within one business day with available capacity, pricing and a site visit.

  • Island-mode gas-CHP power · N+1
  • HGX B300 / H200 / GB10 · MI355X · up to 58 kW/rack
  • Horizon free cooling + CHP heat reuse · PUE ~1.10
  • UK sovereign · GDPR · air-gap options

We reply within one business day. Your details are handled under UK GDPR and never shared.